Solutions · Ontology for Energy Assets

Assets, findings and lenders, connected.

ArborSpace ships with a first domain model for energy assets and due diligence engagements, so the firm starts from its own vocabulary, not from a blank page.

Use case

A similarity engine matches each new case with the firm’s previous ones, and every conclusion traces back to a named rule that a lender’s reviewer can read.

The ontology

The ontology has three layers.

1 The vocabulary: what exists

The classes of objects in the firm’s business:

  • Assets: site, gas turbine, steam turbine, heat recovery steam generator, generator, equipment model, manufacturer.
  • Engagements: due diligence engagement, independent engineer’s report (IER), portfolio.
  • Parties: lender, sponsor, operator.

2 The links: how it holds together

Typed relations, which are never confused with one another:

  • “GT1 feeds HRSG1” is a physical link.
  • “GT1 is a 7F model” is a manufacturer link.
  • “The engagement covers the site” and “the lender finances the project” are contractual and financial links.

These links are what lead from an inspection to its effect on the debt.

3 The rules: what a senior engineer checks

For example, “every planned outage duration is compared with similar outages already completed”, or “every maintenance deferral requires a signed approval”. Each rule produces findings that an engineer validates.

The example that makes it concrete

A line in the maintenance plan (“GT1 inspection, 12 days”) says nothing on its own. The ontology knows that GT1 feeds a boiler that feeds the shared steam turbine. It deduces that the unit loses 306 MW, not a third of its output, and knows which lender carries that risk. No document in the data room contains this path; the ontology does.

What it is not

  • Not a document store: the reports stay where they are.
  • Not a fixed IT data model: the classes are data, which the firm evolves itself.
  • Not an AI that guesses: everything is declared, versioned and verifiable.

The actors

The operator, the due diligence firm, the bank and the trader look at the same unit, but each needs different data.

ActorThe data they need
OperatorHour counters, last inspection, manufacturer interval
Due diligence firmPlanned schedule, completed inspections, actual durations and costs
BankUnit capacity, 2×1 configuration, production plan
TraderOutage calendar, lost capacity, forward sales, price curve over the period

The questions

Each actor asks their own question. Brought together in one model, the data gives four answers in a few clicks.

ActorTheir questionWhat they find at Alder Creek
OperatorAre my turbines on schedule?Gas turbine 2 has run 8% past its inspection interval, while the plan schedules it for 2027.
Due diligence firmIs the seller’s maintenance plan credible?The 2027 inspection is planned at 12 days and 420 kUSD; the same one in 2025 took 15 days and cost 465 kUSD.
BankWhat does maintenance cost the output that repays the debt?306 MW lost during the outage: 2.4% of annual output according to the plan, 3% according to history.
TraderWhich output have I sold that I will not be able to deliver, and when?About 22,000 MWh to buy back if the inspection takes 15 days instead of 12.

An example

One plant, one model, three questions.

Alder Creek is a 612 MW combined-cycle power plant. What is known about it is spread across the maintenance plan, the manufacturer’s documentation, the process diagrams, the asset register and the financial model. ArborSpace brings them together in a single model that can be queried in any direction. Every answer is a path you can check.

Graph of Alder Creek’s objects and their linksMaintenance planGT1 inspection, 2027AT-700F modelInspect every 15,000 hPlant BComparable assetGT1Gas turbineGT2Gas turbineMetersOperating hoursHRSG1Heat recovery boilerSteam turbineSharedBlock ALDER-B1612 MWLoan and contractsDebt service

Path traversed

Link types

Answer

Fictitious data, for illustration only.

The pilot

Six weeks on a narrow scope of your firm.

The question to answer at the end is simple: is the captured memory worth extending to the rest of the firm?

  1. Weeks 1–2Write the first fifteen rules, starting from three questions put to your experts.
  2. Weeks 3–6Apply them to your own engagements.